Tuesday, January 17, 2012

Latest drainage work completed

We just completed a short drainage project that I wanted to share with everyone.  This project took place behind the bunker on the right side of number three fairway.  The area behind this bunker and around number four cartpath stayed wet for days after heavy rain due to the amount of water that weeped out of the bank.

 A transit was used to insure slope.

 This bank was very wet and the ditch instantly filled with water.

Lack of drainage in this area led to the cartpath and surrounding turf always being wet.  This drain will collect all the water coming out of the banks and help dry up the area. 

No comments: