#7 Blue/Gold Tee Renovation

Week 2 of the tee renovations continues with #7 Blue/Gold Tee.  We are splitting up what was a very large and long stretch of tee surface.  We are also eliminating any tee surface on the sloping part of the tee, as well as the small plateau that was in the middle of the tee.  When completed there will be three separate tees in place of the original.

Removing the small plateau and leveling the tee. 

The sloping transition area will now be rough grass.

Finish grade and ready for mix.

Replacing the sod, recycled from this tee and other areas.

These guys have handled lots of sod in the past 2 weeks.

Making sure none of this sod dries out, we want a quick heal.

A view of the new blue/gold tee on #7

This is the front of the new alternate blue tee.

Front left view

Front right view